Loading

Milestone

2003

PWJ Didirikan

Pwj didirikan di Surabaya, Jawa Timur.

2004

Development of the Lamongan Shorebase

Development of the Lamongan Shorebase, including facility design and the preparation of Standard Operating Procedures (SOPs).

2006

Regional Regulation on the Establishment of PJU

A Regional Regulation on the establishment of PJU as a Regional-Owned Enterprise designated PWJ as a subsidiary of PJU.

2007

Establishment of PT SSS

PT SSS was established in Sampang Regency, Madura, East Java.

2009

PT SSS was established in Sampang Regency, Madura, East Java.

PT SIS didirikan di Kabupaten Mamuju, Sulawesi Barat.

2010

Participating Interest Madura Offshore

PPM formalized its ownership of a 10% participating interest in the Santos-operated Madura Offshore Block.

2015

Changes to the Management Structure

The Company revised the composition of its management structure.

2016

Divestasi Saham PPM

Through an Extraordinary General Meeting of Shareholders in February 2016, the acquisition of PPM shares from PWJ was completed, securing a 10% participating interest in the Madura Working Area.

2017

Offshore Supply Base Project

The Company carried out the Offshore Supply Base project at TBPP Probolinggo.

2019

Amendment to the Company’s Business Classification

The Company’s Indonesian Standard Industrial Classification, known as KBLI, was updated to align with its business activities.

2020

Expansion into Energy Trading Services

The Company expanded its energy trading services to include LPG, fuel, condensate, HMU, HPJ, and Adhimix.

2021

EPC Construction Projects

The Company executed civil EPC and mechanical piping works in Rembang, Central Java, as well as tower erection works in Kalanganyar–Grati, East Java.

2022

Field Development Optimization

The Company carried out field development optimization, technical revisions, and reservoir potential evaluations for Pertamina EP Zone 7.

2023

Divestment Process

The divestment process for PT Sampang Sarana Shorebase was undertaken.

2024

MRS and CNG Construction

The Company carried out MRS and CNG construction works, including handling and logistics services.

2025

Reservoir Potential Evaluation

The Company carried out field development optimization, technical revisions, and reservoir potential evaluations in Pertamina Jambi, ONWJ, and Poleng.

430192eedd77c9c1727874a1b32f918d-2-(1)

Eka Winardi

Director

Eka Winardi earned a Master of Management degree from Universitas Airlangga in 2018 and a Bachelor’s degree in Mechanical Engineering from Universitas Andalas in 2000. He also completed the GE Crotonville Leadership Program in the United States. His professional qualifications include certifications in professional engineering, risk management, and ISO auditing.

He previously served as Director of PT Jatim Energy Services (PT JES) and as Vice President of Petrogas Jatim Utama (PJU). He has extensive international experience with multinational companies, including General Electric Power Oil & Gas, Alstom Power, and TEPSCO. He currently serves as Director of PT Petro Gas Wira Jatim (PWJ).

1

Abdul Mujib Imaby

Commissioner

Abdul Mujib Imaby is an Indonesian citizen born in Pasuruan, East Java. He is currently 60 years old.

From 1991 to 2005, he founded PT Citra Abadi and served as its Director. He subsequently served as Director of Operations at PT Hijaz Tour & Travel from 2005 to 2008.

He remains actively involved in the leadership of Roudhotul Qur’an Islamic Boarding School in Pasuruan and currently serves as Commissioner of PT Petro Gas Wira Jatim.